NRC Proposes $3,500 Civil Penalty for Connecticut FirmOver Nuclear Gauge Security Control Deficiencies

Press Release I-16-001: NRC Proposes $3,500 Civil Penalty for Connecticut FirmOver Nuclear Gauge Security Control Deficiencies

Download PDF

NRC Proposes $42,000 Civil Penalty for Connecticut Company for Willful Import, Possession and Distribution Violations

Press Release 16-028: NRC Proposes $42,000 Civil Penalty for Connecticut Company for Willful Import, Possession and Distribution Violations

Download PDF

NRC Proposes $7,000 Civil Penalty for Violation at West Virginia Manufacturing Facility

Nuclear Regulatory Commission - Press Release
No. I-16-014 May 13, 2016
Contact: Diane Screnci, 610-337-5330 Neil Sheehan, 610-337-5331

NRC Proposes $7,000 Civil Penalty for Violation at West Virginia Manufacturing Facility
The Nuclear Regulatory Commission staff is proposing a $7,000 fine for an Atlanta-based company for a violation of agency requirements. The violation involves maintenance inappropriately done on a fixed nuclear gauge at the firm’s manufacturing facility in Fairmont, W.V.

Based on the results of an NRC inspection and investigation carried out at Novelis Corp.’s Fairmont plant, the agency is also issuing a Severity Level III violation to the company.

Novelis performs aluminum sheet and light-gauge fin/foil cold rolling activities at the facility. The company held an NRC license for the possession and use of fixed nuclear gauges at this location. The gauges are used to measure the thickness of the sheet metal products.

The NRC inspection and investigation completed on Jan. 21, 2016, determined that on Sept. 12 and 13, 2014, there was a violation involving the deliberate actions of plant employees. Specifically, an engineering reliability and automation engineer directed an electrical technician to repair nuclear gauge components related to the radiological safety of the device even though Novelis’ NRC license prohibits such activities.

“Our reviews found that the plant employees involved understood the work they were undertaking was not permitted, but they proceeded with the repairs nonetheless in order to minimize the economic impact on the facility from the inoperable gauge,” Acting NRC Region I Administrator
David Lew said. “These activities could have resulted in unnecessary radiological exposure and possibly physical harm. This enforcement action serves as an important reminder of the need for gauge owners and users to adhere to license conditions meant to ensure the proper handling of nuclear materials.”

In a March 8, 2016, letter, Novelis acknowledged the violation occurred, but it disagreed that the employees acted deliberately. After reviewing the information, the NRC staff concluded that the enforcement action was still appropriate. Based on the apparent economic incentive for the violation, the NRC used discretion to double the fine from base amount of $3,500.

Novelis has notified the NRC of prompt and comprehensive corrective and preventive actions in response to the issue, including the termination of its NRC license, which occurred on Jan. 12, 2016.
The NRC is also issuing a Severity Level III violation to the engineering reliability and automation engineer who authorized the technician to work on the gauge.

The company is required to respond to the violation and proposed civil penalty within 30 days.

Download PDF

NRC and Army Corps of Engineers Issue Final Environmental Impact Statement for Bell Bend New Reactor

Press Release 16-019: NRC and Army Corps of Engineers Issue Final Environmental Impact Statement for Bell Bend New Reactor

Download PDF

Susquehanna Steam Electric Station, Units 1 and 2 - Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 through MF6307)

Susquehanna Steam Electric Station, Units 1 and 2 - Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 through MF6307)

Download ML16069A199

Peach Bottom Atomic Power Station, Units 2 and 3 – Issuance of Amendments re: Inservice Leak and Hydrostatic Testing Operation

Peach Bottom Atomic Power Station, Units 2 and 3 – Issuance of Amendments re: Inservice Leak and Hydrostatic Testing Operation

Download ML16084A968

NRC, Pentagon Sign MOU Outlining Roles in Unlicensed Radioactive Material Cleanup at Military Bases

Press Release No. 16-025: NRC, Pentagon Sign MOU Outlining Roles in Unlicensed Radioactive Material Cleanup at Military Bases

Download PDF

PA DEP News Release : DEP Reaches Natural Resource Damage Settlement with Talen Generation, LLC for 2005 Martins Creek Ash Spill

DEP Reaches Natural Resource Damage Settlement with Talen Generation, LLC for 2005 Martins Creek Ash Spill

The Pennsylvania Department of Environmental Protection (DEP) and the Pennsylvania Fish and Boat Commission (PFBC) have entered into an agreement with Talen Generation, LLC, for the company to pay a total of $952,150.00 for natural resource damages associated with the August 2005 ash spill at the Martins Creek Steam Electric Station in Lower Mount Bethel Township, Northampton County. The fine money will be directed to mussel restoration and dam removal projects in tributaries to the Delaware River.

The spill occurred after a wooden stop log in the Ash Basin No. 4 discharge structure failed, causing an estimated 100 million gallons of ash material to spread across local fields and into the Oughoughton Creek and the Delaware River. DEP, working with PFBC, the Delaware River Basin Commission (DRBC) and the New Jersey Department of Environmental Protection (NJDEP), determined that the mussel population in the Delaware River was impacted as a result of both the spill and the cleanup. Mussel restoration and dam removal projects will assist in the restoration and vitality of the mussel populations and improve aquatic habitat and water quality.

Read Article

THREE MILE ISLAND NUCLEAR STATION, UNIT 1: NRC SECURITY INSPECTION REPORT 05000289/2016403

THREE MILE ISLAND NUCLEAR STATION, UNIT 1:  NRC SECURITY INSPECTION REPORT 05000289/2016403

Download ML16123A092

Susquehanna Steam Electric Station, Unit 2 – Acceptance of Requested Licensing Action

Susquehanna Steam Electric Station, Unit 2 – Acceptance of Requested Licensing Action Re: License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.7.1 and 3.8.7 to Allow Replacement of Unit 1 480 Volt Engineered Safeguard System Load Center Transformers

Download ML16109A336

Syndicate content