Below are news reports on a hole found in the steel liner of a reactor containment wall; six days after the story was reported, the hole was attributed to a board embedded in the concrete containment wall.
Beaver County Times
By Bill Vidonic, Times Staff
Friday, April 24, 2009
SHIPPINGPORT — An inspection Thursday revealed corrosion in the steel lining of the nuclear reactor containment building of Beaver Valley Nuclear Power Station’s Unit 1, according to FirstEnergy Corp.
No radiation was released from the building, and there was “no impact to the public health or safety of any employees,” FirstEnergy spokesman Todd Schneider said Friday evening.
The Unit 1 reactor had been shut down since Monday for scheduled refueling and maintenance. As part of that work, Schneider said, the containment building that surrounds the reactor underwent a standard inspection.
The containment building has concrete walls that are 4 feet thick, Schneider said, and there’s a 3/8-inch-thick steel lining on top of that concrete in the building’s interior.
The steel is coated with what Schneider described as “nuclear-grade paint.” An inspection showed a blister in some of that coating. The blister wasn’t cracked, Schneider said.
Once the coating was cleaned, Schneider added, workers found that the steel underneath it had corroded through to the concrete wall. The affected area of the steel is in the shape of a rectangle, Schneider said, about one inch long by about 3/8-inch high. That’s just under the size of a standard paper clip.